
One end of the flange rubber joint is electrically welded to the other end of the butt flange, and the sealing ring should be prevented from being damaged by heat throughout the welding process. In order to make the sealing process, in order to make the bearing capacity of the sealing ring proportional, the screw cap nut must be tightened proportionally at the top corner, and a few tightened and then proportionally supplemented. Secondly, after the pipeline equipment is carried out, the original situation of the double flange rubber joint should be in line with the equipment trick regulations, pay attention to the spacing limit L between the two screw caps unremittingly, and within the limits specified in the main parameters of the commodity trick.
